Precision Titanium Ball End 11.5mm for S-Size Linkages - Yokomo YOKRP-101SH  [YOKRP-101SH]

Yokomo RP-101SH - 4.8 S Size /11.5mm Precision Titanium Ball End
Price:
£6.06
Brand:
Yokomo
Model:
YOKRP-101SH
Please kindly input your name and email address, we will inform you once we have the restocking.
Or you may find similar product under the
category
Write a review

Engineered S-size linkage ball end

The Yokomo YOKRP-101SH is an RC linkage ball end dimensioned for 4.8 S-size systems with an 11.5mm ball length, manufactured from titanium to provide a low-mass yet robust terminal suitable for steering and suspension linkages.

It operates as the interface between turnbuckles or linkage rods and ball studs on servo horns, suspension arms, and bulkheads. The titanium construction helps maintain geometry by resisting deformation under normal model forces.

To install, thread the ball end onto S-size compatible rod threads until it is secure, then locate the ball on the mating stud ensuring full engagement and avoiding excess preload. Verify smooth articulation through the desired range and recheck tightness after initial running sessions.

Use this component when you need a compact, lightweight terminal that preserves steering and suspension geometry; remember that small changes to ball end length will alter throw and toe link geometry, so adjust progressively and test to assess handling impact.

Remark :
Due to limited stock availability, please notice that some Yokomo items may have to order from the factory and the ready time is around 4-6 weeks. Customer purchases the item is assumed to accept the waiting time which allows us to order directly from the manufacturer if the item is out of our warehouse.
Pair with S-size turnbuckles or rods that accept 4.8 specification threads and with ball studs sized to seat an 11.5mm ball end; ensure thread compatibility before assembly.
Yes, the fixed 11.5mm length influences lever arms and toe settings; even small length differences change steering throw and geometry, so tweak setups carefully and evaluate handling after each change.
No special treatment is required; ensure clean threads, engage fully without cross-threading, and confirm there is no play after installation. Recheck after first runs to ensure retention.

Copyright © 2008-2026 rcjaz.co.uk All rights reserved